Laserfiche WebLink
<br />05/23/'2000 15:44 <br />PAGE 02 <br />719-543-1329 <br />• <br />BARNHART AGENCY <br />• <br />EXHIBIT "l" <br />RECLAMATION CO9T <br />s <br />ITEM COBTIUNIT UNIT TOTAL UNITS COST I ACRE flLCY <br />RECLIAM D19TURBED AREA (NO LAKE) 5551 a2 ACRE 75.00 fa1,357 <br />ESTIMATED FAILURE RATE 30% 5551.42 ACRE 22.50 f12.407 <br />FERTILIZERd0lJA N8P SEE ABOVE 0.00 SO <br />FERTILIZER APPLICATION SEE ABOVE 0.00 EO <br />DOZER OR LOADER 5396.05 NRS 139 OB 555,083 556805 LCr f0 10 <br />••MAX PUSH 250 FEET" <br />REPLACING OVERBURDEN St,a90.65 HRS 29949 Ea46435 6957561CY Ef1.64 <br />u+o scnp~r to move. <br />STRIP TOPSOIL 60 ACRES 5283.06 HRS 174.32 549.343 69163 lCV 50.71 <br />REPLACE TOPSOIL 7ti ACRES 5283.08 HRS 111.74 531,629 <br />4DOQMl ACRE GRASS HAY OR STRAW SEE ABOVE ACRE EO <br />SPREAD b CRIMP MULCH SEE ABOVE ACRE EO <br />BACK SLOPING (GONE WITH MINING) 50.00 ACRE O.DO EO <br />MOBILVATIONBDEMOBILIZATION 510.272.00 LS t00 ft0.272 <br /> <br />TOTAL DIRECT RECLAMATION COST ff4B,525 <br />INDIRECT COST OVERHEAD 6 PROFIT <br />( PUBLIC LIAR. INSURANCE) 1.550% 510.021 <br />(CONTRACTOR PERF. BOND) 1.550% f70,02t <br />(CONTRACTOR PROFIT) 10.000% 564,652 <br /> ses,e9s <br />DMG PROJECT ADMINISTRATION EXP. 5.000% 538,58'( <br />TOTAL PERFORMANCE BOND AMOUNT f767,781 <br />COST PER ACRE of tM 7$ Acns 5'10,257 <br />BASED ON 15 ACRES OF LAKE <br />EVANS PIT 0 2 REVISIED <br />s 6 <br />