Laserfiche WebLink
Daniel E. Bear, President <br />Bear Coal Co. Bear #3 Mine <br />September 21, 2007 <br />Page 3 <br />STORMWATER PERMIT COMPLIANCE INSPECTION: <br />The facility was inspected to confirm its compliance with the CDPS stonnwater requirements. Findings <br />of the inspection aze noted below: <br />No violations were noted during the inspection. <br />Reminders <br />• Most regulations, guidance documents, and forms aze available via Internet on the Department's <br />website. Please link to www.cdphestate.co.us/wo for further information. You can link directly to <br />the Engineering Section's webpages at www.cdphestate.co.us/wq/en2ineering/techhom.html <br />Attached to this letter you will find a Customer Satisfaction Survey. We would greatly appreciate it if <br />you would take a few moments to complete this survey and return it to us. Simply fill out the form, fold <br />it according to the directions and drop it in the mail. The postage is already paid! <br />If you have any questions, please contact me at (970)-248-7153. Thank you for your time and <br />cooperation. <br />Jocelyn M ilLhh, PE ~ \ <br />District Engineer <br />Engineering Section, Water Quality Control Division <br />Colorado Department of Public Health and Environment <br />Encl. Enclosure: Industrial Wastewater Inspection Report <br />Stormwater Inspection Report <br />cc: Ken Nordstrom, Delta County Sanitarian (w/out enclosure) <br />Dazcy O'Connor, U.S. EPA Region VIII (w/ enclosure) <br />Dan Mathews, Division of Minerals and Geology, Colorado Department of Natural <br />Resources, 101 South 3rd, Suite 301, Grand Junction CO 81501 (w/out enclosure) <br />Betsy Beaver, Certified Operator Board Liaison, WQCD (w/out enclosure) <br />Leslie Simpson, Compliance Monitoring and Data Management Unit, WQCD (w/ <br />enclosure) <br />Kathy Dolan, CADM Stormwater workgroup, WQCD <br />Kelly Morgan, Enforcement Unit, WQCD (w/ enclosure) <br />J. Mullen Beaz Coal sw Indus insp rpt 73107 <br />