Laserfiche WebLink
147 Areas under Small Area Exemption <br />148 Deleted <br />149 TS#2 Sediment Pond (Temporary Coal Laydown Area) <br />150 Refuse area 2-3 and 4 Combination <br />151 "B" Seam Shaft Light Use Road and Pad Area <br />152 Plan and Profile Proposed Light Use Road to Shaft <br />ILLUS. # TITLE <br />I-1 Geophysical Logs <br />I-2 Typical Road Ditches Design Calculations <br />I-3 Typical Culvert Design Calculations <br />I~ Refuse Area 1, Sediment Pond and Diversion Ditch Design Calculations <br />I-5 Refuse Area 2-3 Sediment Pond and Diversion Ditch Design Calculations <br />I-6 Refuse Area 4 Sediment Pond and Diversion Ditch Design Calculations <br />I-6A Refuse Area 5-A Sediment Pond and Diversion Ditch Design Calculations <br />I-7 D Portal Sediment Pond (DP-1) and Diversion Ditch Design Calculations <br />I-8 Refuse Area Sediment Estimates <br />I-9 Scullion Diversion Design Calculations <br />I-10 Culvert Design Calculations/Haul Road, Scullion Gulch and Red Wash <br /> Tributary <br />I-11 Culvert Design Calculations/County Road Scullion Gulch <br />I-12 Ditch & Culvert DesignNent Entry Area <br />I-13 See Illustration 46 for Water Discharge Permit <br />• <br />I-14 LOGS <br />I-15 LOGS <br />I-16 LOGS <br />I-17 CMLRD Comments and Responses <br />I-18 OSM Comments and Responses <br />I-19 CDOW Comments and Responses <br />I-20 Geotechnical Investigation/D Portal <br />I-21 Geotechnical InvestigatioNRefuse Area <br />I-22 "D" Portal Post-Reclamation Sediment Dam Design Calculation <br />I-23 Subsidence/Strain Calculations Room and Pillar Area <br />I-24 Proposed Vegetation Sampling/1981 <br />I-25 Range Site Evaluation <br />I-26 Planting Specifications <br />I-27 Typical Culvert 8 Ditch Calculations/County and Access Roads <br />I-28 Drainage Control/Station 7+43/County Road 65 <br />I-29 Peak Runoff Calculations/Conveyor Road and RR Loop <br />I-30 Ditch Capacities Calculations/Conveyor Road and RR Loop <br />I-31 Calculations of Sediment Volume, Settlement Volume and Storage Volume for <br /> Sedimentation Ponds <br />I-32 Design of Culverts for Conveyor Alignment as of 3/30/81 <br />I-33 Relationship between Topsoil Pile and Sediment Pond Sizes <br />I-34 Ponds Sizing Calculations -Sedimentation and Erosion Control Ponds <br />. <br />I-35 Pond Sizing Calculations -Inside Railroad Loading Loop (Pond RR3) <br />(Renewal #3, 11/99) <br />