Laserfiche WebLink
79 Refuse Area Sediment Pond RP-2 and 3 Plan, Sections and Details <br /> 80 Refuse Area Sediment Pond RP-4 Plan, Sections and Details <br />• 80A Refuse Area Sediment Pond RP-5A Details <br /> 80B Typical Principal Spillway Plans, Sections 8 Details <br /> 81 Refuse Area Sites 1, 2, 3, and 4 Reclamation Map <br /> 82 Refuse Area Topsoil Map <br /> 83 Refuse Area Reclaimed Cross Sections <br /> 84 Refuse Area Base Map <br /> 85 Deleted <br /> 86 Vent. Entry Area Watershed and Drainage Map <br /> 87 Vent. Entry Area Base Map <br /> 88 Vent. Entry Area Access Road R5 P & P <br /> 89 Vent. Entry Area Site Restoration <br /> 90 Alluvial Well Area Site Grading Plan <br /> 91 Alluvial Well Area Access Road P 8 P <br /> 92 Alluvial Well Area Site Restoration <br /> 93 Deleted <br /> 94 Deleted <br /> 95 Deleted <br /> 96 Deleted <br /> 97 Deleted <br />• 98 Deleted <br /> 99 Deleted <br /> 100 Deleted <br /> 101 B Portal Location <br /> 102 Alluvial Valley Floor Map <br /> 102A Deleted <br /> 103 Site Plan Railroad Loadout Loop Sheet 67 <br /> 103A Grading Plan Railroad Loadout Loop Sheet 68 <br /> 104 Reclamation Plan Railroad Loadout Loop <br /> 105 Site Plan and Reclamation Plan Coal Storage Area <br /> 106 Overland Conveyor and Maintenance Road P & P Sheet 1 <br /> 107 Overland Conveyor and Maintenance Road P & P Sheet 2 <br /> 108 Overland Conveyor and Maintenance Road P 8 P Sheet 3 <br /> 109 Overland Conveyor and Maintenance Road P & P Sheet 4 <br /> 110 Overland Conveyor and Maintenance Road P 8 P Sheet 5 <br /> 111 Overland Conveyor and Maintenance Road P 8 P Sheet 6 <br /> 112 Overland Conveyor and Maintenance Road P & P Sheet 7 <br /> 113 Overland Conveyor and Maintenance Road P & P Sheet 8 <br /> 114 Overland Conveyor and Maintenance Road Detail Sheet 1 <br /> 114A Overland Conveyor and Maintenance Road Detail Sheet 2 <br />. 115 Deleted <br />(Renewal #3, 11/99) <br />