Laserfiche WebLink
<br />PART i <br />Page 6 <br />Permit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />1. Effluent Limitations (continued) <br />d) 3urden of Proof Requirement <br />The permictee has the burden of proof <br />total suspended solids (TSS}, total i <br />limitations. Relief shall be granted <br />not be granted when the permittee has <br />The permiuee should endeavor to meet <br />whenever possible. <br />when requesting relief from <br />:on and/or settleable so Lids <br />only when necessary and she d <br />control over the discharge. <br />the primary limitations <br />i) For rainfall, to waive TSS and total iron limitations, it is <br />necessary co prove that discharge occurred within 43 hours attar <br />measurable precipitation has stopped. In addition, to waive <br />seccleabLe solids limitations, is is necessary co Drove that <br />discharge occurred within 42 hours altar precipitation greater <br />than the 10-year, 24-hccr ever.[ has stopped. <br />21 For snowmelt. to :naive TSS and co cal iron ].imicaciocis, it is <br />necessary co prove chat discharge occurred within 48 hours attar <br />pond inflow has stopped, In addition, co wai~~e settleable <br />solids limitations, is is necessar;~ co prove chat discharge <br />occurred within 4& hcurs 3Lter pond in=low volume greater [h an <br />the 10-veer, 24-hour event has stopped. <br />The "u iv is ion shall determine the adequacy of proof. As Dart of <br />this decermiracion, the Division shall evaluate whether [he <br />permittee ceuld have controlled the discharge in such a manner that <br />primary limitations could have been me r. A11 manual dewacering <br />must meet rS5 and co cal iron limitations. <br />2. Stormwacer Mar.agemenc Plan <br />T_he permitcee snail or=_pare and submit two COD 185 of a Stormwatar <br />Management 21an (StJhlP) to the 'dater Quality Control Division. T, he <br />oLan shall be submitted within six months from the dac=_ chat <br />certi=icacion under this oermit as pranced to the fac'1~- an- <br />additional copy o[ the olan shall be submitted co: <br />~ciorado Department o2 ya Aral 3esources <br />Mined Lana RecLamacton Division - Coal :^.ining Section <br />~Z3 Centennial Buildi^.g <br />i'_i: Sherman Street <br />Denver, CO 3020'. <br />The Division will review and aopcove each plan. Uoon ap?rovaL, the <br />plan shall be Lncornoracaa into the permittee's cercificacion by <br />reference. ,allure to implement the approved Dian ss described shall <br />be ~ ~~io is don of the oermi=. The ?inn shai'_ .=_main in -_fecc 3s vmk <br />as the .ac '_'_i _•; _., -=_guiaced Se a -;OPS pe r^~i t. <br />