Laserfiche WebLink
Exhibit E - Rec amation Plan <br /> Reclamation follows over the shoulder with extraction activities. In general, it is to the advantage <br /> of the operator to reclaim and release affected lands along the perimeters of existing ponds to <br /> reduce reclamation and warranty expenditures and speed overall site recovery and development,in <br /> conformance with the limitations specified under Exhibit L-Reclamation Costs, or as modified. <br /> The location and approximate size of each resulting pond and attending shoreline is detailed on <br /> Exhibit F-Reclamation Plan Map. The operation is mined and reclaimed concurrently,as detailed <br /> on Exhibit C-2: Mining Plan Map and Exhibit D- Mining Plan. Four ponds will result in <br /> extracted basins at IV, V, VI and II, respectively. The Settling Pond(s), Wash Pond, and III, <br /> will be revegetated to the approximate original contours. <br /> ) A description of each of the following: <br /> i) Final grading -specify maximum anticipated slope gradient or expected ranges <br /> thereof; <br /> ii) Seeding - specify types, mixtures, quantities, and expected time(s) of seeding and <br /> planting; <br /> iii) Fertilization - if applicable, specify types, mixtures, quantities and time of <br /> application; <br /> iv) Revegetation - specify types of trees, shrubs, etc., quantities, size and location; and <br /> v) Topsoiling -specify anticipated minimum depth or range of depths for those areas <br /> where topsoil will be replaced. <br /> i. Final grading will be at 3h:1v or flatter, except as provided for under Rule 3.1.5(7), above, <br /> and as indicated under Exhibit D- Mining Plan. <br /> ii. Refer to Table E-1: Revegetation Seed Mixture. <br /> iii. Actual fertilizer rates will be based upon soil tests taken at the time of reapplication of <br /> salvaged soil to affected lands remaining above water level. Refer to Exhibit I- Soils Information. <br /> Regardless, a theoretical rate is included under Exhibit L- Reclamation Cost Estimate, for that <br /> purpose. <br /> iv. The site will be reseeded and stabilized with native grasses,pending residential, <br /> commercial and industrial development of the post resource recovery site. <br /> V. Please refer to Exhibit D -Mining Plan and Exhibit I- Soils Information. Mean resoiling <br /> depth is six inches. <br /> 9 <br /> EXHIBIT E- Reclamation Plan <br /> Colorado Division of Mineral s & Geology Regular Impact [1121 Construction Material Permit <br /> Sand Land, Inc. - Kurtz Resource Recovery & Development Project - January 1999 <br />