Laserfiche WebLink
The Pittsburg & Midwa Co Mining LIIIIIIIIIIIIIIIIII <br />P&M Coal SEP 1 Q ~~J P.O. Box 176 <br />The Edna Mine Oak Creek Co 80467 <br />MINED LAND <br />RECLAMATION OIVISIOr1 <br />September 16, 1985 <br />Ms. Anne Baldrige <br />Mine Land Reclamation Division <br />1313 Sherman St., Room 423 <br />Denver, CO 80203-2273 <br />Dear hls. Baldrige: <br />This letter follows up the discussion between yourself and Mr. <br />Terry Crowner of PF,M during the latest Cb1LRD reclamation inspection <br />of the Edna Coal D1ine. Your discussion centered on expanding the <br />rill and gully variance area on upper Center Ridge. <br />On Friday, September 13, 1985, you inspected the Edna Mine. A <br />portion of the inspection focused on the rill and gully area of <br />variance on upper Center Ridge. After examining the area, it was <br />decided that the area of variance would be better defined by ex- <br />panding the boundaries to coincide with other features of the <br />landscape. <br />Therfore, PAM requests that the area of the rill and gully <br />variance, approved on August 16, 1985, be expanded to lie within <br />the following three boundaries: the main haul road; the ridge line <br />of Center Ridge; and the upper Center Ridge utility road ( as shown <br />on Exhibit 3.5-1 of the Mine's permit application). This expanded <br />area will be approximately eleven acres in size. <br />Following approval, the rills and gullies will be monitored as <br />outlined in the original variance request. Should you require <br />further information, please contact the Mine. <br />GAlIr;D Joao- <br />(5~~~~ Iz-3-8~ <br />Sincerely, <br />CAP IA..~.UO -. (,r~ <br />YJo /' t R <br /> <br />,.,. r~' <br />~-~ <br />Gulf <br />i <br />Mike Campbell <br />Reclamation Technician <br />ASUBSI DIARY OF GVLF OIL COPORATION TELEPHONE 1309) ~96-a 171 <br />