Laserfiche WebLink
~. . <br />COLORADO DEPARTMENT OF HEALTH, Water Quality Control Division <br />Renewal Permit Rationale - Page 3. Permit No.: COG-850000. <br />II. Permit Changes (continued) <br />Other chanties: The boiler place language in Part I. Section C., and Part <br />II. is being revised to reflect the more condensed language currently <br />used in individual permits. Where changes were necessary to reflect the <br />differences between general permit requirements and individual permit <br />requirements, such changes have also been made. <br />No other significant changes are being made to this general permit. <br />III. Reporting <br />There have been occasions where specific permittees have not properly <br />followed the Noncompliance Notification Requirements specified in Part <br />II.A.3. of the permit. Where a request for relief from total suspended <br />_=.olids and total iron and/or settleable solids limitations is desired, <br />t:he permittee must also submit the documentation specified under Part <br />]:.B.l.d) - Burden of Proof Requirements. Failure to do so may result in <br />e~nforcemenc action and/or revocation of authorization to discharge under <br />t:he general permit. <br />IV. 4Thoie Effluent Toxicity (WET) Testing <br />Section G.9.7(2)(a)(i)(A) of the Regulations For the State Discharge <br />1?ermit System b.1.0 (SCCR 1002-2) exempts facilities certified under this <br />general permit from WET testing requirements. <br />V. Antidegradation <br />'Ihe discharges certified under this permit are not reviewable waters <br />pursuant to section 3.1.8(3)(a) of the Basic Standards and Methodologies <br />Eor Surface Waters 3.1.0 (SCCR 1002-2). <br />Jon C. Kubic <br />January 16, 1992 <br />VI. Public Notice Comments <br /> <br />• <br />Verbal Comments were received by EPA Region VIII. Their primary concern <br />related to the compliance date for construction and/or related <br />activities. The draft permit stated chat this dace was three years after <br />the effective date of the permit. IC was the Division's intention to <br />state chat attainment of operational Level would occur as soon as <br />possible, but in no event later than three years after the permit becomes <br />effective. The Einal permit will clarify this to indicate that the <br />Division will permit reasonable timetables for construction with • <br />appropriate completion dates; but, the latest date acceptable for <br />completion will be June 30, 1995. A long construction schedule will be <br />anptoved only if major construction is required. The Division will <br />ensure chat no construction schedule is excessively long. <br />