My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25386
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:09 PM
Creation date
11/20/2007 5:31:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Hydrology
Doc Date
6/22/1992
Doc Name
FINAL PERMIT COLORADO WASTEWATER DISCHARGE PERMIT SYSTEM CO-G-850008 H-G COAL CO
From
CDOH
To
RICHARD G ATKINSON
Permit Index Doc Type
OTHER SURFACE WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 8 <br />• Permit No. COC-800000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Stormwa[er Manar{ement Plan (continued) <br />d) The plan shall include a list of personnel directly responsible <br />for s[ormwacer management. The plan shall describe [he procedures <br />to be followed for personnel co judge compliance with the SWMP. <br />e) The plan shall provide for proper traininz of affected employees <br />in techniques and procedures that will assure achievement of all <br />stated goals. <br />f) The permittee shall amend this plan at any time if there i.s a <br />change in operation chat will or may result in a deterioration in <br />the quality of pollutants addressed by this plan, or if the plan <br />is shown co be ineffective in achieving the specified goals. A <br />copy of the amended plan shall be submitted to the Division and <br />the CMLRD within 30 days, along with an explanation of the reason <br />for the amendment. If the Division finds the amended plan to be <br />inadequate, or if the procedures established are shown to be <br />ineffective once in place, the permittee shall develop and employ <br />• new procedures. <br />g) The permittee shall submit arnuai rP.pOLLS due on the anniversary <br />dace of the specific facility certification. Each report shall be <br />signed and certified (sae Part I.C.6.j and shal'_ ircLude a <br />statement affirming chat a thorough inspection of all affected <br />operations covered under this plan has occurred at least once per <br />quarter during the period covered by the report. If the <br />inspection detects complete conformance with the plan, this shall <br />be so stated. If the inspection shows the plan to be <br />inappropriate or ineffective in any area, the annual report shall <br />address how the permittee has corrected or intends [o correct this <br />deficiency. All annual reports shall become a part of this permit <br />by reference. <br />h) Whenever a facility or a portion of a facility enters the <br />post-mining phase, is is likely that the overall configuration of <br />the site will change considerably. As the Land is reclaimed, <br />roads, railroad lines and structures w111 be removed, and <br />significanr. reshaping of the surface will occur. Prior to the <br />time when new vegetation becomes established, the surface areas <br />will be subject to potentially significant erosion. The permittee <br />will need to take adequate measures in order to minimize this <br />erosion. Therefore, at the time of post-mining, the permittee <br />shall amend the plan to include specific procedures to minimize <br />• erosion and ocher factors that contribute to the discharge of <br />total suspended solids and ocher pollutants from newly reclaimed <br />areas. A copy of the amended plan shall be submitted to the <br />Division and the CMLRD with the amendment request co change from <br />active co post-mining requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.