My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25386
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:09 PM
Creation date
11/20/2007 5:31:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Hydrology
Doc Date
6/22/1992
Doc Name
FINAL PERMIT COLORADO WASTEWATER DISCHARGE PERMIT SYSTEM CO-G-850008 H-G COAL CO
From
CDOH
To
RICHARD G ATKINSON
Permit Index Doc Type
OTHER SURFACE WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br />PART I <br />Page 6 <br />Permit No <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />1. Effluent Limitations (continued) <br />d) Burden of Proof Requirement <br />The permittee has the burden of proof <br />total suspended solids (TSS), total i <br />limitations. Relief shall be granted <br />not be granted when the permittee has <br />The permittee should endeavor [o meet <br />whenever possible. <br />COG-850000 <br />when requesting relief from <br />-on and/or settleable solids <br />only when necessary and shall <br />control over the discharge. <br />the primary limitations <br />1) For rainfall. [o waive TSS and total iron limitations, it is <br />necessary [o prove that discharge occurred within 48 hours after <br />measurable precipitation has stopped. In addition, to waive <br />settleable solids limitations, it is necessary to prove that <br />discharge occurred within 48 hours after precipitation greater <br />than the 10-year, 24-hour event has stopped. <br />2) For snowmelt. co waive TSS and total iron ].imitations, is is <br />• necessary to prove that discharge occurred within 48 hours after <br />pond inflow has stopped. In addition, to waive settleable <br />solids limitations, it is necessary co prove that discharge <br />occurred within 48 hcurs after pond inflow volume greater than <br />the 10-year, 24-hour event has stopped. <br />The Division shall determine the adequacy of proof. As part of <br />this de[ermiration, Che Division shall evaluate whether the <br />permittee could have controlled the discharge in such a manner that <br />primary limitations could have been met. All manual dewaCering <br />must meet TSS and to cal iron limitations. <br />2. Stormwater Management Plan <br />The permittee shall prepare and submit two copies of a Stormwater <br />Management Plan (SWMP) to the Water Quality Control Division. The <br />plan shall be submitted within six months from the date chat <br />certification under this permit was eran[ed to the facility. An <br />additional copy of the plan shall be submitted to <br />Cclorado Department of Natural Resources <br />Mined Land Reclamation Division - Coal Mining Section <br />423 Centennial Building <br />1313 Sherman Street - <br />Denver, CO 80203 <br />. The Division will review and approve each plan. Upon approval, the <br />plan shall be incorporated into the permittee's certification by <br />reference. Failure to implement the approved plan as described shall <br />be a violation of the permit. The plan shall remain in effect as long <br />as the Facility is regulated by a CDPS permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.