Laserfiche WebLink
PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />INSPECTOR'S NAME: Roy Karo <br />FACILITY CONFIGORATION: Stockpond <br />SITE NAME: T-1 <br />MINE NAME: Seneca II-W <br />MINE I.D, NO.: C-82-057 <br />DATE: 8/20/2002 <br />DATE LAST INSPECTION: 6/20/2002 <br />LOCATION: SW3aSE~, Sec 16, TSN, R68W <br />LOCATION: 8 mi S of Rayden, CO <br />OWNER'S REP.: RoY Karo <br />Circle or xrite in appropriate response <br />1. Angle of slope; 3:1 upstream, 3:1 downstream Total = 6:1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment slopes: Yes N/A <br /> At natural hillside: Yes N/A <br /> Over widespread areas: Yes N/A <br /> From downstream foundation area: Yes N/A <br /> "Boils" beneath stream or ponded water: Yes N/A <br />3. Cracks or scarps on crest: Yes N/A <br />9. Cracks or scarps on slope: Yes N/A <br />5. Sloughing or bulging on slope: Yes N/A <br />6. *Maj or erosion problems: Yes N/A <br />7. Surface movements in valley bottom or on hillside: Yes N/A <br />8. *Erosion of toe: Yes N/A <br />9. *Water impounded against downstream toe: Yes N/A <br />10. Existing embankment freeboard: Approximately 9.0 feet <br />11. x Increase Decrease in water level: feet <br />12. Cracks, bulging, or erosion on upstream face: Yes o <br />~ N/A <br />13. Spillway erosion: _ _ _ _ Yes N/A <br />14. *Clogging <br />Spillway channels: Yes ~ N/A <br />Diversion ditches: Yes o N/A <br />BULL a ~ SC~1i ~e~ ; <br />*Maj or adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />43 <br />