Laserfiche WebLink
~~ ., <br />~; `_. ~ <br />I certify that I am a Registered Professional Engineer in the States <br />of Colorado and New Mexico and that I personally observed the con- <br />struction of the sediment pond 9-P8. To the best of my knowledge <br />and belief, the construction of the pond is in accordance with the <br />drawing of the said pond with one exception. Afield change was <br />made to move the location.of the emergency spillway closer to the <br />primary spillway. The emergency spillway was constructed in <br />accordance with the drawings and the new location does not in any <br />way affect the performance of the pond. Furthermore, to the best <br />of my knowledge and belief, all organic material was removed from the <br />embankment and the topsoil was salvaged. <br />i <br />2 <br />Rodney G. La ence P.E: <br />New Mexico C rtification No. 7976 <br />