Laserfiche WebLink
RECEIVED <br />2 OD2 <br />QUARTERLY POND INSPECTION REPORT <br />Division of Minerals b Geology <br />Minrec, Inc. C-81-025 puarter: Second <br />North Thom son Creek Mines Inspection Date: 10-Jun <br />Identification <br />of Pond <br />s During Inspection: <br />iximate Water Level <br />tent (% total storage) <br />iw (gPrn) <br />P-9 Refuse Lon T-1 T-2 <br />Sediment Sediment Treatment Treatment Treatment <br />Rills & Gulleys No No No <br />Inadequate Vegetation No No No <br />Ouile[ Channel Erosion No No No <br />Burrows No No No <br />'III Differential Settling <br />Cracks or Slides <br />Seepage <br />No I No <br />'Appurtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Other <br />~IAdditfonel Comments <br />No <br />No No No No <br />No No No No <br />Water being pumped to stock watering tank. <br />Drawing D-2-5 shows the location of the long pond & ponds T-1, T•2 and P-9 <br />Drawing D-4-8 shows the location of the refuse pond. <br />lance Required: None <br />Controls: The storm water management plan controls were <br />The vegetation on the pond outslopes, the mine F <br />inspected and vegetation was found to be adequ: <br />of Inspector: Jim Stover <br /> <br />L II <br />Date <br />