Laserfiche WebLink
<br />• <br />M~Ilette Oil Co. <br />P.O. fSox 93~ <br />Leadville. Colo. 80161 <br />III IIIIIIIIIIIIIIII <br />RECEIVED <br />Petroleum Producl~ for Minin`, C4 Con.~Lrucli~~EB ~ o <br />31„83 <br />February 19,1983 <br />tdr. Peter V. 0"Connor <br />DeI:~ of ?Iatural Resources <br />rained Land Reclamation lliv, <br />1313 Sherman St. <br />Denver Colo, 80203 <br />MINED L4ND RECLAMATION <br />COLO. DEPT. OF NATURAL REDO;:.^,CES <br />Re: Willow Creel. Kline. File 90 83-11 <br />Doc No 769 <br />Dear 14r. O'Connor; <br />I am enclosing the 2nd legal notice from the local newspaper <br />and three of the four certified returns of notices to <br />adjacent landowners. I do not have one from 14r. Federsen, <br />but I am sending a copy of the receipt of certified mail that <br />I mailed the notice to him on. <br />Also the following exhibits will be revised to read: <br />A Exhibit E Reclamation Flan <br />1. The final slopes of my pond will be no steeper than <br />a ratio of 2:1, horizontal to vertical, except from <br />5ft above to 10 ft below the expected water line, <br />where the slopes will be no steeper than 3:1, horizontal. <br />to vertical. This can be accomplished easily with a <br />dragline by redistributing the existing materiel. <br />B Exhibit H Reclamation Costs <br />1. The following costs x111 be revised: <br />Resloping with Dozer, changed to 6"/ac a $0.94/cu yd, <br />for a total of $75tl.27 per acre. Redistributing , <br />topsoil revised to 9'/ac ~ $0.94/cu yd or $1137.40 <br />per acre. This brings the total reclamation cost to <br />$2073.77 per acre. I have the $5000.00 Bond. <br />C Miscellaneous <br />hir. Henry Federsen's ob,7ection has not been resolved. <br />I believe it should be brought before the board. <br />I appreciate your help. <br />Respectful_lyA, <br />~y~1T `Q~'~'+-~ <br />Jon F. T'rL;.]ette <br />