My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-05-03_PERMIT FILE - M1983052
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1983052
>
1983-05-03_PERMIT FILE - M1983052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 11:50:58 AM
Creation date
11/20/2007 5:28:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983052
IBM Index Class Name
Permit File
Doc Date
5/3/1983
Doc Name
PN M-83-052 JOKER MINE & PILOT PLANT PERMIT APPLICATION
From
MLRD
To
WILLIAM B WRAY JR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.0 Cp1�R9 DEPARTMENT OF NATURAL RESOURCES 999 <br /> F r <br /> o MINED LAND RECLAMATION DILj�ION <br /> N <br /> DAM C.SHELTON Director <br /> * 1876 <br /> Richard D Lamm <br /> Governor <br /> May 3, 1983 <br /> Mr. William B. Wray, Jr. <br /> Attorney at Law <br /> Van Cott, Bagley, Cornwall & McCarthy <br /> Suite 1600 <br /> 50 South Main Street <br /> Salt Lake City, Utah 84144 <br /> Re: Joker Kline and Pilot Plant Permit Application <br /> Our File No. 83-52 <br /> Dear Mr. Wray: <br /> The Division has reviewed the above-referenced permit application for <br /> adequacy and have the following questions/comments which are intended to <br /> tiring this application into compliance with the law. This application <br /> will be presented before the Mined Land Reclamation Board at the May <br /> 25-26, 1983 meeting. Please respond to the following questions/comments, <br /> point-by-point, by May 13, 1983, to provide review time for the staff. <br /> A. Exhibit D - Mining Plan <br /> It is unclear where exactly the two dams are located. From <br /> the Division's understanding, one dam is on the south end of area <br /> "F" (from map, Exhibit F-1 ) and the second dam is on the south end <br /> of area "C" (from map, Exhibit F-1 ) . Is this correct? Also, <br /> please provide a cross-sectional diagram to scale of these two dams. <br /> \ <br /> -&. Please specify the direction of mining and the sequence from <br /> one olock to another to be followed. These determinations must be <br /> made prior to Board consideration. If the direction of mining <br /> and/or sequence from one block to another changes, then the <br /> operator needs to notify the Division via a technical revision or <br /> an amendment. This technical revision or amendment would then have <br /> to be approved by the Board. <br /> Will a 10-acre block be totally backfilled and reclaimed <br /> before proceeding to the next 10-acre block? If not, then please <br /> upwardly amend the maximum disturbance at any one time figure to <br /> reflect this extra acreage. AkAX. C�uo,NU <br /> 423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.