Laserfiche WebLink
Review Checklist for Pond Inspection Reports <br />Pond inspection period: 1g~ quarter 2007 <br />Mine :Edna <br />CDRMS Permit No.: C-1980-001 <br />Date review completed: May 1, 2007 <br />CDRMS reviewer: Byron G. Walker <br /> Require- <br /> Requirement ment <br />Requirement citation complied Comment <br /> with ? <br /> es/no <br />Quarterly reports <br />Timely submittal of CDMG regulation PAP, page 4.6-138 (no time <br />quarterly pond inspection 4.05.9(17) Yes specified). Required by June 30, <br />report 2007, received April 19, 2007 <br />Qualified inspector CDMG regulation <br />4.05.90 7) Yes Accomplished by Chris Miller <br />Content of quarterly report CDMG regulation <br />(structural weakness, other 4.05.9(17) yes) <br />hazardous conditions) <br />