My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25279
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:04 PM
Creation date
11/20/2007 5:26:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978210
IBM Index Class Name
Hydrology
Doc Date
3/20/2006
Doc Name
Substitute Water Supply Plan
From
OSE
To
DMG
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr, Steve Nguyen, P.E. <br />March 9, 2006 <br />Page 3 <br />11. If reclamation of the mine site produces a permanent water surface exposing groundwater to <br />evaporation, an application for a plan for augmentation must be filed with the Division 1 Water Court <br />at least three (3) years prior to the completion of mining to include, but not be limited to, long-term <br />evaporation losses. If a lined pond results after reclamation, replacement of lagged depletions shall <br />continue until there is no longer an effect on stream flow. Granting of this plan does not imply <br />approval by this office of any such court application(s). <br />12. In accordance with amendments to §25-8-202(7), C.R.S., and Senate Bill 89-181 Rules and <br />Regulations adopted on February 4, 1992, the State Engineer shall determine whether the substitute <br />supply is of a quality to meet requirements of use to senior appropriators. As such, water quality data <br />or analysis may be requested at any time to determine if the water quality is appropriate for <br />downstream water users. <br />13. Should this plan expire without renewal or be revoked prior to adjudication of a permanent plan for <br />augmentation, all use of ground water must cease immediately. <br />14. The decision of the state engineer shall have no precedential or evidentiary force, shall not create any <br />presumptions, shift the burden of proof, or serve as a defense in any pending water court case orany <br />other legal action that may be initiated conceming this plan. This decision shall not bind the state <br />engineerto act in a similar manner in any other applications involving other plans, or in any proposed <br />renewal of this plan, and shall not imply concurrence with any findings of fact or conclusions of law <br />contained herein, or with the engineering methodologies used by the Applicant. <br />Please contact loans Comaniciu in Denver at (303) 866-3581, or Dave Nettles in Greeley at (970) 352- <br />8712, if you have any questions conceming this approval. <br />Sincerely, <br />~~~ <br />Jeff Deatherage, P.E. <br />Water Resource Engineer <br />Attachments: Table I <br />Cc: Dave Nettles, Assistant Division Engineer, 810 9'" Avenue, Suite 200, Greeley, Colorado 80631, <br />(970}352-8712 <br />George Varra, Water Commissioner, Water District 3,1400 Hwy 287 N, Fort Collins, Colorado 80524, <br />(970)484-1628) <br />Division of Minerals and Geology <br />JD/IC-Geisert Pit SWSP <br />
The URL can be used to link to this page
Your browser does not support the video tag.