Laserfiche WebLink
:~ <br /> <br />RECLAMATION FAST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Descri ptian ~ Cost (f) <br />4 ~ Close Portals ~ f2,661 <br />6 ~ Close 10 Air Vent Shef is ~ 511,261 <br />Subtotal (K): f13,922 <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Descr ipt ian <br />N. MISCELLANEOUS RECLANATI ON TASKS <br />Task No.l Task Description <br />Subtotal (L): <br />Lost (S) <br />Cost (f) <br />I____________ <br />f30, 705 <br />512,686 <br />10 ~ Mob/Demob ~ f3,400 <br />Subtotal (M): 546,791 <br />------------ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): f68,420 <br />II. 1ND IRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Lost (f) <br />9 ~ Demolition-Buildings <br />8 ~ Seeding <br />Fencing <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ 51,061 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ 5667 <br />3. ~ Contractor's Profit........... 70.00% of dir. ~ 56,842 <br />4. ~ Job Superintendent.. <br />Subtotal (A ): f8,570 <br />------------ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 576,990 <br />B. DMG PROJECT ADNINI STRATTON EXPENSES <br />Item No.~ Item Description ~ Cost (f) <br />________I__________________________________________________I____________ <br />1. ~ Contract Prep., Eng. Fees..... 4.25% of cntr.~ f3,272 <br />2. ~ Staff Admin. Expenses......... 0.75% of cntr.~ 5577 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): (3,849 <br />__________ ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f12,419 <br />____________ <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): f80, 839 <br />