Laserfiche WebLink
HOURLY PRODUCTION shoot 2 0l 2 <br />Haullno Caoaclty <br />Scraper Paybarl Iwe;tim) F3asis Scraper Howl (volume) Basis <br />Material woight . t,800 {wunds/LCY Struck volume 32.00 LCY <br />Material doscnpticn Hoapod volume : 44 00 LCY <br />Top Soil Averego volume : 38.00 LCY <br />Ratod payload : 104.000 pounds Adjusted capacity : 38.00 LCY "' <br />Payload Caparlly: 65.00 LCV '^nn,•tv:aomxuon mtlrxrx ~.NUme vrv ur°cxr r+~r rvr.~•°r~, r~wlnk <br />Cvcle Time : Job Condition Corrections : Silo altituclo (ft.) : 4.950 <br />Scraper Push dozer ~ Source <br />Scraper bading bmo ' : 2.40 minutes Altitude adj.. r.000 NA (Car H(3) <br />Manouvor and spread limo : 0.70 minutes Job etliciency 0.830 NA (Cat HBI <br />•',aya tna tx+:trq,°r p°~r an p,°r~;; moods Nel ('ArreClien : 0.830 NA <br />Travel limo <br />Road condition description :Rutted dl R, Irf11e maintenance, no water, 2" Ilre penetration <br />Haul Routo <br />Sog. a Haul distanco (fool) Gredo (%) Roil. res. (%) Total res. (%) Velocity (Ipm) Travel Uma (mm.)" <br />1 800 2.00 5.00 7,00 1002 0.84 <br />Haul time : 0.84 minutes <br />Rotum reuto <br />1 800 -2.00 5.00 3.00 ?870 0.52 <br />I <br />•'tnvetemekrerrseprnentnmiureaftaramaieratlavgacek.mon Retum tlmo 0.52 minulo3 <br />tlbte valool~es uu mm allernebb Oa Idd; mie;en[9 sn°wn, rat sverapo <br />Total scraper loam cyGe time (load + haul + maneuver and spread * return) 4.47 mmules <br />Unadjusted unit produdlonRtour 510.15 LCY/tqur "' Adjusted for job conditions . 423A2 LCYRteur <br />Optimal numbor of scrapors per push donor : NA Selected numbor of scrajwrs f scrapor(s) <br />Adjusted single scraper team (unit) hourly production •t23 dz LCYlhour <br />Adjusted multiple screjwr team (fleet) hourly production 423.42 LCYRtour <br />JOB TIME AND COST <br />F legit stn. / Team(s) Total job lima 6.02 Hours <br />Unit asst f0.590 ;LCV Total lob cost : 51,514 <br />