My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57383
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:44 PM
Creation date
11/20/2007 5:25:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m2004044
IBM Index Class Name
Permit File
Doc Date
2/24/2006
Doc Name
Cost Summary Form
From
DMG
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Canaclty: shnel2 of 2 <br />Scraper Payload (woighq Bans : Scripor Bowl (volumo) Basis . <br />Material weight : 1,600 poundsiLCY Struck volume . 32.00 LCY <br />Material descripUOn : Heaped volume . 44 00 LCV <br />Top Sd/ Average volume : 38.00 LCY <br />Rated paybad : 104,000 pounds Adjusted capaclly : 38.00 LCY "' <br />PAybadCApatily : 65.00 LCY ~"~antr;me,.a+v+rc~nsx.MumePas craArrNprun;vsq.c,din gypa <br />Cvclo Tlme : ~ n f l n r I n Sdo alhtudo (it.) 4,950 <br /> Scraper Push donor Saurco <br />Scraper loading lime' : 240 minutes Allitudo ad).: 1.000 NA (Cal HB) <br />Manouver and sproad limo : 0.70 mmWes Job effiGoncy :~ 0.830 NA (Cat H©) <br />' kwd emn pot ureper ~r on Nxe~wll mMeN Nel wrreclion : 0.830 <br />~~ - ~- - - ~ NA <br />Travel lima : - <br />Road condition descripllon :Bulled dirt, fif0e merMenonce, no water, ?' hrv perrofrafron <br />Haul Route <br />Seg_p Haul dlstanco (foal) Grado (°!o) -Roll. res. (%) Total res. (%) Velocity (fpm) Travel lime (min.)" <br />f 700 •8.00 5.00 -J.00 i 2989 0.31 <br /> <br /> <br /> <br />_ ___ i i <br /> Haul Umo ; 0.31 minutes <br />Retum_route <br />1 700 8.00 ~ 5.00 13.00 947 I 0 78 <br /> 1 • <br /> - <br /> <br /> I <br />trmM umo Wr aacn wpmeN b aoryaaa for acoelNaliaNOemlwatlgn Relum time 0.78 minulos <br />Indn wW Wee qro m,u olydenOro pa rotor ro~aLnoe elgwn. nW nverape <br />Total scraper loam cycle time (load + haul + maneuvor and sproad + roturn) ~ 4.18 minutes <br />Unadjusted unit productbruhour : 544.89 LCYRiour "' Ad)usled for Job conditions : J52 2ti LCYlhour <br />Optimal number of scrapers pot push donor : NA Salocted numbor of scrapers : ? scrape(s) <br /> AdJustod single scraper team (uniQ hourly production : 904. S2 LCV/hour <br /> Adjusted multiple scraper team (fleeq hourly production 1,809.01 LCYlhour <br /> <br />JOB TIME AND COST <br />neat sae 2 Team(s) Total Job limo 28.98 I W urs <br />Umt cost 50.556 /LCY Total job cost 529,175 <br />
The URL can be used to link to this page
Your browser does not support the video tag.