Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task p : 018 State :Cotomdo <br />PenniUjob # .M-2004-044 <br />Date . 10/07Q005 County :Adnms AbbreviaUOn :none <br />User : LDO Sito :Tucson South R esource Filename :M04a.~0 iti <br />Agency or organization name :DMG <br />Permd or other job action :New pennrt redamat+an cost esbrnnte <br />Task doscriptimr Rip stockpile/Plant area 33.6 ac. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cnt 08R Senes Il - 8U Horsepower : 3 f0 <br />Blade typo :lhuvorsal <br />Attechmonl no. 1 : ROPS Ceb Shill basis : 1 per tley <br />Attachment no. 2 :3-shook ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : 548.85 NA <br />Dozer operating cosUhour 569.32 t00 <br />Ripper operating cosUhour 57 82 100 <br />Operator cosUhour : $3 t. 78 NA <br />Total unit cosUhour 5157 77 Total fleet cosUhour 5157.77 <br />MATERIAL QUANTITIES <br />Selected esUmating method Area <br />AltrrnaM_rnelhQ~~ <br />Solamic : NA NA Load factor : NA Bank volume : NA BCV <br />Area : 33.80 acros Rip depth Qt) : 1.50 Volume : 81,312 BCY or CCY <br />Suurcr, of estimated quantity : ExniWf L <br />Source of estimated load lector : NA <br />HOURLY PRODUCTION <br />Altemale.Lngihods <br />Solsmlc : Seismic vebcily : NA IeeUsacond <br />Unadjusted produdlon : NA cu yds.lhour <br />Area : Avg. ripping depth : 1.50 feoVpass <br />A <br />Pr <br /> <br />JOB TIME AND COST <br />Fleet s¢e : 1 donor(s) <br />Unit cost : 50.096 per cu. yd. <br />Average dozer spend : 88.00 feoUminuto <br />verago maneuver limo : 0.25 minutestpass <br />eduction per unit area : 0.822 arresrhour <br />Unadfusted producUOn : 1.989.27 cu yds.lhour <br />Unadjusted produrti0n <br />per selected method : 1.989.27 w. ydsfiour <br />Site altitude 4,950 lent <br />Altitude adjustment : 1.00 (Cot Hr3) <br />Job eHicroncy factor : 0.83 (1 shrfVdey) <br />Not pb conecllon : 0.83 mullipller <br />Adjusted <br />Total job limo 49.25 hours <br />Total job cost : S7, 770 <br />