Laserfiche WebLink
III IIIIIIIIIIIIIIII --~ <br />RECEIVED <br />JAN ;. ~ 1996 <br />Divisbn of Minerals 6 Geuk>~ <br />Grid Junction <br />GRAND VALLfiY COAL COMPANY - Third Auarter 1995 <br />WATBR SAMPLING RfiPORT Sampled by: John M. Walters <br />Date 30-Sep-95 Meters Calibrated yes <br />Weather Conditions This year has been relatively wet but the last <br />part of the summer has been dry. There was a small amount of rain <br />last night. Unable to catch the creeks flowing this quarter this <br />quarter. Sampling was delayed until the end of the 9uarter. <br />Sampling Conditions: All wells were bailed prior to sampling. All <br />ephemeral channels fixcept the north split of Munger Creek were <br />dry. There was no flow from the mine split of Munger Creek. <br />Field Sampling Results <br />Sample (C) <br />Point TIMB TfiMP Ph BC VO&G SWL FLOW <br />(CFS) <br />SURFACE WATfiR 30-Sep-95 <br />SW-1 12:10 PM 12.2 8.52 2,200 none N/A 3.67 <br />SW-2 9:35 AM DRY DRY DRY DRY DRY DRY <br />SW-3 10:54 AM 9.9 8.92 680 NONE N/A (2 gpm <br />SW-5 9:40 AM DRY DRY DRY DRY DRY DRY <br />SW-6 10:40 AM DRY DRY DRY DRY DRY DRY <br />SW-8 11:25 AM 15.6 8.96 1,550 none N/A N/A <br />GROUND WATBR 30-Sep-95 <br />GW-1 10:04 AM 12.6 7.39 5,200 none 7.79 <br />GW-3 12:35 PM 12.6 7.10 4,600 none 18.70 <br />GW-4 11:50 AM 10.6 7.31 4,200 none 11.50 <br />GW-6 10:31 AM DRY DRY DRY DRY DRY DRY <br />Location of Points/Wells <br />SW-1 - fiast Salt Creek above McClane. <br />SW-2 - McClane Creek at culvert below mine. <br />SW-3 - Munger Creek at haul road culvert below mine. <br />SW-5 - McClane Creek above mine site at culvert inlet <br />SW-8 - Sast Salt Creek between Munger and McClane Creeks. <br />GW-1 - Alluvium of Bast Salt Creek about 3 miles above McClane. <br />GW-3 - Alluvium of Sast Salt Creek just below Munger Canyon. <br />GW-4 - Alluvium of Bast Salt Creek between Munger and McClane. <br />GW-6 - In Munger Canyon at the permitted waste rock disposal area. <br />