Laserfiche WebLink
<br />~ARTERLY POND INSPECTION ~ORT ' <br />, III IIIIIIIIIIIIIIII <br />OPERATOR: GRAND MESA COAL CO. QUARTER: FIRST QUARTER 1989 <br />"LINE: RED CANYON MINE DATE OF INSPECTION: MARCH 22, 1989 <br />POND IDENTIFICATION 1 <br />'TYPE OF POND SEDIMENT <br />STATUS DURING INSPECTION: <br />(APPROXIMATE WATER LEVEL 24" <br />I <br />SED (% total storage) 30% <br />(OUTFLOW (cfis) NONE <br />I <br />(FEATURES PROBLEM COMMENTS <br />EROSIONAL: <br />I YES NO <br />I <br />~ Rills & Gullet's X <br />Inadequate Vegetation X <br />Dutlet Channel Erosion X <br />Burrows X <br />Other X <br />STRUCTURAL: <br />I <br />Differential Settling X I <br />Cracks or Slides X <br />Seepage X <br />Other X <br />APPURTENANT STRUCTURES: <br />Deflective Spillways X <br />Dewater Device Clogged X <br />~ Faulty Gates, Etc. X <br />Other X <br />ADDITIONAL COMMENTS: WATER LEVEL ABOUT 12" BELOW SPILLWAY INVERT <br />MAINTENANCE REQUIRED: NONE <br />NAME OF INSPECTOR: JIM STOVER <br />