Laserfiche WebLink
~~ 1 <br /> <br />~RTERLY POND INSPECTION <br />OPERATOR:.MINREC. INC. ~ <br />~ i <br />MINES: (NORTH THOMPSON CREEK <br />POND IDENTIFICATION <br />TYPE OF POND <br />L <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL j <br />SED (ro total storage) E <br />OUTFLOW (cfsl ~ <br />FEATURES <br />EROSIONAL: <br />Rills & Gullevs <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />T <br />PHGE 2 OF SI <br />I <br />9UHRTER: THIRD 9UARTER 1991 I <br />-- <br />DATE OF INSPECTION: SEPTEMBER 27, 1991 ~ <br />P-6 P-7 P-8 P-9 REFUSE i <br />DETENTION DETENTION DETENTION SEDIMENT (SEDIMENT <br />DRY I ARY i DRY i 12" ~ DRY <br />OK I OK I OK ~ OK i OK <br />NONE ~ NONE ~ NONE ~ NONE ~ NONE <br />PROBLEM <br />YES( NO <br />COMMENTS <br />.STRUCTURAL: I <br />~ Differential Settling I X <br />I 'r~ I <br />Cracks or Slides ~ X <br />~~ <br />Seepage I i X ~ i <br />--i--~ <br />Other ~ ~ X i <br />i ~ <br />APPURTENHNT STRUCTURES: <br />~~ <br />Defective Spillways L i X ~ I <br />i <br />Gewater Device Clogged I ~ X <br />~{~'; ~ <br />Faulty Gates. Etc. I I X j ~ <br />i Other ~ L X I _ _- <br />! i <br />ADDITIONAL COMMENTS: AN OPEN CHANNEL SPILLWAY WAS CONSTRUCTED FOR PGNG <br />P-9 SEPTEMBER 19. 1991. <br />MAINTEi~ANCE RE9UIRED: NDNE <br />NAME OF INSPECTOR: JIM STOVER ~~~/~- ~~ _~ _~ ~ <br />