Laserfiche WebLink
INSPECTION SCHEDULE <br />Al] of the check dam structures will be inspected in conjunction with the quarterly <br />pond inspection reports. These inspections will check for stability and erosional features. <br />Since these check dams aze designed for flow velocity reduction and not for effluent <br />water treatment, the structures will no[ be checked for sediment capacity or water volume <br />contained. The check dams, as a part of their function, will however create temporazy <br />impoundments of water. Once the structures have filled with sediment it will be reported <br />to the Division in the inspection reports and those impoundments, with the approval of <br />the Division, will be removed from the inspection list. <br />The following check dam structures meet the above listed criteria and no longer <br />require inspection: <br />CD - 1 <br />CD-2 <br />CD-3 <br />CD-4 <br />CD-5 <br />CD-6 <br />CD-7 <br />CD-8 <br />February 3, 2005 <br />