My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25209
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:45:00 PM
Creation date
11/20/2007 5:23:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
3/21/1990
Doc Name
1st Qtr 1990 Inspections
From
PEABODY COAL CO
To
MLRD
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry impoundments <br />INSPECTOR'S NAME: Dennis Jones <br />'JPDES I D NO <br />DATE: 2/16/90 <br />F,4CILITY CONFIGU Incised Pond DATE LAST INSPECTION: 10/17/89 <br />SITE NAME: Wad a Im oundment #002 LOCATION: NW'/. NE',~~ Sec. 34 T6N R87W j <br />1•tINE NAME: eneca .ine ea o y oa o LOCATION: mi. ~ or ay en, <br />MINE I.D. N .: ermi - - OWNER'S R .. on u ian, upt. <br />Circle or write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil): _ Yes No <br />2. Lift thickness: in. <br />3. Compaction according to approved plan: Yes No <br />4. Burning (specify extent and location): Yes IJo <br />5. Angle of slope: upstream, downstream Tota] _ _ N/A <br />5. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: Yes No N <br /> At isolated points on em an ment s opes: Yes IJo <br /> At natural hillside: Yes N/A <br /> Over widespread areas: Yes ~ N <br /> From downstream foundation area: Yes to N <br /> "boils" beneath stream or ponded wa er: Yes !o N/A <br />7. Cracks or scarps on crest: Yes No /A <br />8. Cracks or scarps on slope: Yes No <br />9. Sloughing or bulging an slope: Yes No /A <br />10. *Major erosion problems: Yes ® N/A <br />11. Surface movements in valley bottom or on hillside: Yes Qo N/A <br />12. *Erosion of toe: Yes No N!A <br />13. *Water impounded against toe: Yes No N A <br />14. Existing embankment freeboard: N/A fee t <br />15. Increase Decrease in water level: see comments fee t <br />16. Cracks, bulging, or erosion on upstream face: Yes No N/A <br />17. Visible sumps or sinkholes in slurry surface: Yes No N/A <br />18. *Clogging <br /> Spillway channels and pipes: Yes Jo i•!/A <br /> Decant system: Yes Po ~! A~ <br /> Diversion ditches: Yes Jo N/A <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: Yes No N/.4 <br /> Decant system: Yes IJo I A <br />20. Trash racks clear and in place: e® No ~~FA- <br />*14ajor adverse changes in these items could cause instability and should he reported to <br />the Engineering I4anager and Mine Superintendent for further evaluation. Adverse condi- <br />tions noted in these items should normally be described (extent, location, volume, etc.) <br />in the space on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.