Laserfiche WebLink
13:15 GOLDEfC ~=LEn`!EW ELK MiiYE WESTON <br />IV <br />`, CATION OF RECORDS ' <br />s SPCC Plan prepared by CFSI Stoel Corporation comprises the <br />is for a continuing oit spill prevention program as required by <br />t, Volume 38, No. 237, Part ft. The SPCC Plan wilt be updated <br />follows <br />t3y attachment of Inspection records as described below. <br />In the event of a major oil spill Incident, or, <br />P.22 <br />Once every three years, if an oil spill incident has not occu~•red. <br />foltow(ng routine inspection programs are required: <br />OII Storage and Trasfer Record <br />~/ <br />i <br />L <br />011 storage and transfer records are maintained on a dally basis <br />These records will ba malntalned et the mine offlees, and are avall- <br />able for inapaetlon and reference. <br />Inspection of Tanks, Valves, and Pipes <br />Each oil storage tank, transfer pipe, and valves must be ~` <br />i~i,,~for evidence of damage, leakage, or wear. Tha form used <br />for recording this preventative Inspection is included In Appendix 8. <br />inspection of Effluent Channels end Sumps <br />A datlly Inspeetlorlt should be made of each mayor dreinac~e channel, <br />and oil containment sump to determine it oil spillage has occurred <br />durine~ the previous Z4 hours. This inspection Is vary Important, <br />because It will provide early warning of potential serious spills. <br />various oil transfer and preventative maintenance records required <br />the SPCC Plan must be malntalned and lx available to: EPA Inspectors <br />^11 times. These records provide CFbI Steel Corporation with written <br />33 <br />