Laserfiche WebLink
JAN X77 '25 13 13 ,OLDEN~~IGLEiNEW ELK NINE WESTON ~- <br />t. Malntaln records concerning each «nderground Ilquld fuel <br /> <br />Installation. <br />P.20 <br />2. Install approved leak detecting devices on new submersed pump <br />Insttllttioni'as well as repairs to existine~ systems. <br /> <br />,, <br />3. Post state approved leek detection test procedures at each underground <br />Ilquld fuel installation. <br />4. Conduct pipeline and tank testing as required to assure no leaks are <br />present . <br />5. Malntaln for one year records concerning tests for underground leaks. <br />8, Report liquid fuel leaks In excess of 2S0 gallons from a Ilquld petroleum <br />product stortge facility to the Sttta Inspector of Olls within 36 hours of <br />discovery ^nd/or suspicion thereof. <br />i <br />I~ <br />i <br />7. Be prepared to remove and dispose of unconfined qusntities of <br />Ilquld fuels when directed by the State Inspector of Oils. <br />tl. Install corrosion protection In all new underground tiquld fuel instal- <br />Ittfons In accordance with the uniform fire code. <br />State Inspector of Oils <br />Mr. Michael J. Powell <br />Chief of Oit Inspection Section <br />Department of Labor b Employment <br />1001 East 62nd Avenue, Buildinct No. 1 <br />Denver, CO 80216 <br />Phone: (303) 289-5643 <br />A copy of the regulations Is attached In Appendix. C. <br />i <br />1 <br />~.. <br />L SPILL CONTAI <br /> <br />r <br />th• want of an unavoidable spill, CFGI Steel Corporttion will commit <br />necessary funds and manpower required for clarnup <br />31 <br />