Laserfiche WebLink
• 'JAN 07 '85 13 06 GGLDEN/~QGLE~NEW ELK NINE WESION ~ P. 12 <br />SECTION II • <br />' ~ SPILL PREVENTION ANp CONTAINMENT <br />A. COUNTERMEASURES !. ,.; <br />i TM SPCC Plan requlros preventative conerol of all potential apllla <br />that may contaminate navigable water. Tha following arai plin~ for <br />areas considered to have a potential fora ^plll: •~ <br />i <br />i <br />d <br />Reference, <br />I 1. Sunrise Mine <br />af. Bulk storage tanks <br />(f) Mobile overhead tanks <br />A steel plate wall or a concrete dike hawing an enclosed <br />1 capacity of approximately 10,000 gallons will be Installed _, <br />1 <br />~~ around tM tank bash. ,. <br />i 1. Allen Mlne ,(, <br />! .,~;: ; <br />.c •:.y . <br />i. Bulk storage tanks - `' `:.' ` ' <br />~ te) thru (h) An earth dlko has bean construeted.in thla . <br />I aru with a capacity to contain the volume of the Iairag~at tank: <br />4 <br />I <br />No splllane will end up in the surface drainage of the <br />area. <br />3. Maacwall Mine <br />1. Bulk storage tanks ~, . <br />~~ (a1 thru (d) An earthen dike having the capacity`equlvalent to <br />} the storage capacity of each tank will be bu{It around each lank <br />to contain possible rupture of the tanks. <br />