Laserfiche WebLink
<br />SPN 07 '86 13 00 GOLUENr9GLE~NEW ELK MINE WESTON <br />c <br />P.6 <br />• <br />0, Mine Substations <br />All surface substations aro constructed on a built-up <br /> <br />i <br />i <br />A <br />1 <br />gravel .base whereby ~ goad drainage pattern is assured. <br />Any oil spill within the substation enclosure would not <br />spread beyond the safety fence. <br />All surface transformers .use transformer oil as 'any Insulating . <br />median, Askarel Insulators or PCB's are not used dim surface <br />transformers at the Sunrise Mine. <br />r . <br />8. ALLEN MIN6 <br />1. Silo Storage <br /> <br />An oil storage area eontalning approximately 1110 barrels of <br />miscellaneous lube oils is located in this area. 7 he oil <br />storage area Is in an enclosed area with concrete floors and <br />no drain erase. Should drums be ruptured during delivery, <br />spillage would not flow any appreciable distanco and would <br />ba immediately c{eaned up by person on site. No major <br />spill potential exists In this area. <br />2, Hoist House <br />There ^re two steel tanks in this Brea. One has approximately . <br />200 gallons of hydraulic oil: this tank Is surrounded:by a•;,_.:,. ~. <br />concrete dike, The second tank is filled with'fuat:`oit and',is::~ :'''• . ? <br />;.. <br />surrounded by an earthen dike. No major spill potential ~ , <br />exists In this area. ~ ' <br />9 <br /> <br />