Laserfiche WebLink
© CLIMAX MOLYBDENUM COMPANY `~ <br />A Subsidiary of Phelps Dodge Corporation <br /> <br />~CT 2 6 2006 <br />October 2a, 2006 <br />vision of Reclamation, <br />CERTIFIED MAII.: 700111400011295467146 Mining and Safety <br />CLIMAX MINE <br />Hwy 91 <br />Climax, Colorado 80429 <br />(719J 486-2150 <br />Fez [7191 48&2251 <br />~~~ i <br />~~ <br />Mr. Allen Sorenson <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colomdo 80203 <br />r/~ <br />RE: Climaa Mine, Permit No. M-1977-493, EPF Certification Mayflower Decant <br />•-- <br />Dear Mr. Sorenson: <br />Climax submitted construction drawings to the Colorado Division of Minerals and Geology for an upgrade <br />to the Mayflower Tailing Impoundment decant system January 30, 2006. Construction of this facility has <br />been completed in accordance with the constmction drawings with minor adjustments to the structure <br />footers as required by site conditions. The adjustmens to the footers were reviewed and approved by the <br />design engineer. <br />I certify that the Mayflower Decant Stmchrre was completed in accordance with the construction design <br />drawings with engineer approved footer design adjustments. <br />If you have any further questions regarding this project, please contact me at (719) 486-2150 extension <br />615. <br />Sincerely, <br />~~ <br />Tavis D. Rogers, P.E. <br />Senior Engineer, Climax Mine <br />CC: Gary Slifka, Sr. Emironmerual Engineer, Climax Mine <br />Jay Cupp, Site Manger, Climax Mine <br />pQ .•• <br />. o~ . ~yQE <br />v ° ~` , <br />r -.a c 4 <br />e [V <br />~e <br />.~~' ~~` <br />AL `~~~.```~~• <br />