My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57202
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:34 PM
Creation date
11/20/2007 5:21:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05.3 Operation Plan - Permit Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Future coal refuse placement and stockpile construction will utilize <br />essentially the same methods and sequence of activities which have been <br />utilized for ongoing refuse placement activities to date with the <br />exceptions of a reduction in lift thickness to two feet and layered <br />placement of coarse and fine refuse. These sequenced activities are as <br />follows: <br />o Extend existing stockpile collection ditches <br />o Remove topsoil and vegetative materials from expansion foundation <br />area <br />o Extend existing rock subdrains <br />o Place and compact refuse material according to design <br />o Grade top surface and side slopes to provide effective drainage <br />o Replace and grade topsoil <br />o Revegetate topsoiled areas <br />Existing perimeter collection ditches as shown on the Mine Area Surface <br />and Groundwater Hydrology Map, (Map 12), collect and route runoff from <br />disturbed refuse stockpile areas to existing Sedimentation Pond No. 4. <br />Existing collection ditches on the north and west side of the refuse pile <br />have been constructed to their design length. However, the south refuse <br />pile collection ditch has been extended only as far as was necessary to <br />control drainage from disturbed areas. As topsoil materials are stripped <br />ahead of refuse pile advance, extension of the south refuse pile <br />collection ditch will be sequenced to coincide with topsoil removal <br />operations so that disturbed area drainage is controlled at all times. <br />Detailed designs for drainage and sediment control structures associated <br />with the permanent coal refuse stockpile have been developed and are <br />presented in Exhibit 19, Drainage and Sediment Control Plan. Tracked <br />dozers, tractor scrapers and/or wheel loaders and trucks will be utilized <br />as appropriate for excavation and ditch construction. Generally, all <br />ditches will be trapezoidal in shape and have been designed to provide a <br />minimum of 1 foot of freeboard above the peak flow level for the design <br />event. <br />• <br />C' \ W O N K \PR1\XNlfiOf R I S. P E V <br />a~A,lmm 2.05.3-33R Revised April 1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.