Laserfiche WebLink
• Y.L P' P:v'F` 'Eyi § 53• RY FT ~ T: S .~.."'G Sa. '9. <br />~,~ t~ ~'~Li~ti:e .~..x..t..~'`a~^~~;'f ~~~v ...x nx ~~~~'i~.m'~x ~~ T~ ~'".,`~w.~x°Fex. -x~x~,~s4'~w`.x. w'.~,5x~x,~~ <br />HOURLY PRODUCTION sheet 2 of 2 <br />Haulino Caoacltv <br />Basis <br />Material weight : 2,100 pounds/LCY <br />Material desciption <br />EaRh-Loam <br />Bowl (voklme) Basis <br />Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average voume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY "' <br />Rated payload : 75,000 pounds <br />Payload capacity : 35.71 LCY <br />u <br />nowt' produtlian renew volume per scraperpair a+push-W~~ modes <br />Cycle Time : ob Condition Corrections : Ske altkude (ft.) : 8,000 <br /> suaper Push dozer Source <br />Scraper boding time' : 1.00 minutes Attitude adj.: 0.980 NA (Caf HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency 0.830 AL4 (Cat HB) <br />load tlme per saapar pair on push-pun models Net correction . 0.813 NA <br />Travel time <br />Road condition description :Firm, smooth, rolling, dirtNt. suAaced, watered, maintained <br />Haul Route <br />Seg. # Haul distance (feet) Grade (96) Roll. res. (%) Total res. (%) VeWcity (tpm) Travel time (min.)" <br />1 3,000 2.00 3.00 5.00 1867 1.73 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />HaW time : 1.73 minutes <br />• <br />Retum route <br />1 $000 -2.00 3.00 1.00 2963 t.14 <br />•• travel time foreaU segment is ad(usted for acceleralioNdeoekratian: <br />Able vebd0es are mos. attainable per total resistanm shown, rqt average <br />Retumtime: 1.f4 minutes <br />Total suaper team cycle time (load + haW + maneuver and spread + return) : 4.46 minutes <br />Unadjusted unit produdionlhour : 899.39 LCYftlour "' Adjusted for jab conditions : 588.88 LCYltwur <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single suaper team (unit) houry production : 588.88 LCY/hour <br />Adjusted multiple suaper team (fleet) hourly production : 1,137.77 LCY/hour <br />Yz3`~26 'a;.4a .may... r~ »~mr~:rri`:...~'s'" ~_ ~.cs.,xsY"' 33r.Nr..~+"5-S3Ya°z3 ..F wx..« ~ _ . yx~^ g <br />?xT s'h.~x'~x ,'~, ~`:~~x`.~tB~~~~~:szl};.x~a.:a~5,~`-`~'~.,t.~?~"~"'°x~>M~>.xfi~,?~~~~~'~ e6y Fs~ot~. w.: *'~~~3 <br />JOB TIME AMD COST <br />Fleet size : 2 Team(s) Total job time : 35.10 Hours <br />Unit cost : 51.124 /LCV Total job cost : $44,893 <br />