Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 042 State :Colorado Permiflob# : C-1982-057 <br />Date : 08rY/SQ005 County : Roulf Abbreviation :none <br />User : JRS Site :Seneca li-W Filename : C057-042 <br />Agency or organizafion name :Colorado Division OlMinerals And Geology <br />Permit or other job action :Permit Renewal 04 <br />Task description : Regrade Pond 16a <br /> <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cet D9R - 9SU Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. t : BOPS Cab Shift basis : 1 perday <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> tltiGzatton 96 <br />Cogs Breakdown : Umership mst/hour : 351.0! NA <br /> Operating cost/hour : 593.55 100 <br /> Ripper op.cosUhour: 30.00 0 <br /> Operator cosUhour : <br />Total unit costlhour: 331.78 <br />Et76.34 NA <br />Total fleet cosVhour: <br />,4176.34 <br />~~ x~. <br />MATERIALOUANTITIES <br />Initial Swell tAOSe <br />volume : 20,300 CCY factor: 1.125 volume : 22,838 LCY <br />Source of estimated volume :Page 25.1-27 <br />Source of estimated swell factor :CAT Harm'book <br />Average push distance : t50 feet <br />Unadjusted howdy production : 910.5 LCYmr <br />Job Condition Correction Factors <br />Source <br />Matedal consistency description <br />Compacted fig or embankment <br />• <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 7,500 feet <br />Material weight : 2,650 IbsILCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Vsibiliry : t.00 <br />Job etfidency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Attitude: t.DO <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net wrredion : 0.39 <br />Adjusted unit production : 354,06 LCY/hr <br />Adjusted fleet production : 354.06 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 64,50 Hours <br />Unit cost : 30.498 /LCY Total job cost : $11,374 <br />