My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57187
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:33 PM
Creation date
11/20/2007 5:20:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
6/16/2006
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CJ <br />CIRCES Cost Estimating Software <br />• <br />PROJECT IDENTIFICATION <br />Task # : 039 <br />Date : 08r052t7o5 <br />User : JRS <br />Agen y or organization name :Colorado Division O/ Minerals And <br />Permit or otherjob action :Permit Ronewa104 <br />task description :Regrade Pond 009 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />State :Colorado <br />County : Routt <br />Site :Seneca li-W <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-lJniversal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization % <br />Ownership cosUhour : $51.01 NA <br />Opereting mstJhour : $93.55 100 <br />Ripper op. cosUhour : $0.00 0 <br />ODerdtor cost/trour : 531.78 NA <br />Total unit cesUhour : E176.34 Total fleet mstltrotu <br />MATERIAL QUANTITIES <br />Initial <br />volume: 10,000 CCY <br />Swell Loose <br />factor : 1.125 volume <br />Source of estimated volume :Page 25-f-27 <br />Source of estimated swell factor:CATHandbook <br />HOURLY PRODUCTION <br />Average push distance : i50 feet <br />Unadjusted hourly production : 910.5 LCYRrc <br />Material consistency desuiption <br />Comaacted Rll ar embankment <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 7,500 feet <br />Malarial weight : 2,650 IbslLCY <br />Weight description <br />Decomposedrack - 25% Rock, 75% EaRh <br /> <br />Permitlob# : C-1982-057 <br />Abbreviation :none <br />Filename : C057-039 <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />5176.34 <br />11,250 LCY <br /> <br />kS . . <br />dition Correction Factors <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job effi~ency : O.B3 <br />Spoil pile : O.BO <br />Push gradient : 1.00 <br />Attitude : 1.00 <br />Mafedal weigh : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.39 <br />Source <br />Adjusted unit production : 354.06 LCY/hr <br />Adjusted fleet production : 354.08 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 31.77 Hours <br />Unit cost : $0.498 /LCY Total job cost : $5, 603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.