My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57187
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:33 PM
Creation date
11/20/2007 5:20:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
6/16/2006
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estirnatind SoHware <br />Task # : 025 State :Colorado Penniflob # : Gl982--057 <br />Date : 08/052005 County : Rout Abbreviation :none <br />User : JRS Site :Seneca /i-W Filename : C057-025 <br />Agency or organization name :Colorado Division O/MinemisAnd Geology <br />Permit or other job action :Permit Renewa104 <br />Task description :Rip Haul Roads <br />~J <br />HOURLY EQUIPMENT COST <br />Alternate methods - <br />Seismtc : <br />Area: <br /> tJti)ization °/, <br />Cost Breakdown : Ownership cosi/hour : $111.09 NA <br />Dozer operating cosNhour : 5188 32 100 <br />Ripper operating cosUhour : $14.58 100 <br />Operator cosUhour : $31.78 NA <br />Total unit cosUhour : 5345.77 Total fleet 1:d511hour <br />NA NA Load factor <br />70.00 acres Rip depth (fl) <br />Selected estimating method <br />NA Bank volume <br />3.00 Volume <br />Oata source : (CRG) <br />Aga <br />51,383.09 <br />NA BCY <br />338,800 BCY or CCY <br />Source of estimated quantity :Page 25-1-19 <br />Source of estimated load factor ; NA <br />HOURLY PRODUCTION <br />Altemate methods - <br />Seismie : Seismic velocity : NA feeUsewnd <br />Unadjusted production : NA cu. yds./hour <br /> <br />Araa : Avg. ripping depth : 3.51 feeUpass <br />Average ripping vridth : 9.83 feeUpass <br />Average ripping length : 300.00 feeUpass <br />Average dozer speed : 88.00 feeUminute <br />Average maneuver time : 0.25 minuteslpass <br />Production pet unit area : 1.110 acres/trour <br />Unadjusted production : 6,286.32 cu. ydsJhour <br />JOB'RME AN_D COST <br />Basic machine : Cat Dt 1 R -11 U Horsepower : 850 <br />81ade type :Universal <br />Attactrment no. 1 :BOPS Cab Shifl basis : 1 pe~day <br />Attachment no. 2 :3-shank ripper <br />Unadjusted production <br />per selected method <br />Site afhtude <br />Attihrde adjustment <br />Job efficiency factor <br />Net job correction <br />Adjusted unft production <br />ldjusted fleet production <br />6,286.32 cu. yds./hour <br />7,500 <br />L00 feet <br />(CatHB) <br />0.83 (1 striRlday) <br />0.83 mufiiplier <br />7.64 cu. yds.lhour <br />x0.57 cu. yds.lhour <br />Fleet size : 4 tlozer(s) Total job time : 16.23 hours <br />Unit Lost : $0.066 per cu. yd. Total job cost : 522,452 <br />.~.: .%.a.„S3"xs t„'#~a''~`~;~...,3 i fL~A.s..s'a,",11..K.,: - k;, "zt<,.x <br />
The URL can be used to link to this page
Your browser does not support the video tag.