My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57171
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:33 PM
Creation date
11/20/2007 5:20:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pages 93R to 155L
Section_Exhibit Name
EXHIBIT 19 MINE AREA DIVERSIONS AND DITCHES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hvdrolow Results <br />• (Using SEDCAD+ computer model: Refer to Table 18, Magpie <br />Creek Diversion - 10-Year, 24-Hour Hydrograph Analysis, <br />at the end of this section, for computer printouts.) <br />Peak Discharge <br />10-year, 24-hour event: 29.63 cfs <br />100-year, 24-hour event: 142.7 cfs <br />Total Design Discharge for Lower Reach of Diversion: <br />10-year, 24-hour event: 172.24 cfs <br />100-year, 24-hour event: 528.6 cfs <br />Diversion Design <br />The Magpie Creek Diversion was designed utilizing Manning's <br />Equation for Open Channel Flow, as discussed in the Methodology <br />and Assumptions section of this exhibit. Design results are <br />summarized in on Map 25A, Magpie Creek Permanent Diversion. <br />EFCI will place two foot high drop structures in the upper <br />portions (sections D-R)of the permanent division to reduce the <br />channel grade to less than 0.5 percent. Splash pans will be <br />constructed at the base of the drop structures and will extend <br />approximately four feet beyond the toe. The drop structures and <br />and pan will be constructed with large rocks (Dso=18"), concrete or <br />Gabion structures. A typical drop structure is shown on Figure 8, <br />Typical Drop Structure. Approximate locations of the drop <br />structures are shown on Map 25A, Magpie Creek Permanent Diversion. <br />The upper portion of Magpie will be lined with vegetation. If <br />required, mulch and or erosion control matting will be utilized <br />to help reestablish vegetation in the channel. The lower portion <br />(section R-W) of the permanent diversion will be lined with <br />riprap. Channel dimensions and riprap requirements are shown on <br />Map 25A, Magpie Creek Permanent Diversion. Riprap sizing was <br />determined using the PADER method. To be conservative, the <br />required riprap size was increased by six inches. Channel design <br />computer printouts are included in Table 19. <br />• <br />TR-32 144 Revised 10/O1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.