Laserfiche WebLink
• North Refuse Collection Ditch. The north refuse collection ditch extends <br />along the northern toe of the refuse storage pile. This ditch collects <br />all surface drainage flowing off the north slope of the pile, in addition <br />to flow contributions from the west collection ditch, and conveys it to <br />Sediment Pond 4. The north collection ditch is divided into three (3) <br />sections as shown on Figure 3, Refuse Disposal Area Drainage Plan. Each <br />section has the same channel slope but different channel configuration. <br />Section A is designed as a trapezoidal channel with a 5-foot bottom width <br />and 2H:1V sideslopes. The channel section extends approximately 750 feet <br />at a 3.6 percent slope. The design velocity is 4.8 fps, therefore, <br />vegetative erosion protection is adequate for this section. <br />Section B is designed as a trapezoidal channel with an 8-foot bottom width <br />and 2H:1V sideslopes. The channel section extends for approximately 340 <br />feet at a 3.6 percent slope. The design velocity is 5.0 fps, therefore, <br />• vegetative lining provides effective erosion protection for this section. <br />Section C is designed as a trapezoidal channel with a 2-foot bottom width <br />and 2H:1V sideslopes. The channel section extends approximately 420 feet <br />at a 3.6 percent slope. The calculated velocity (6.2 fps) exceeds 5.0 <br />feet per second, therefore, rock riprap (D~, = 8 inches) is installed in <br />Section C to prevent erosion. The riprap is placed to an approximate <br />depth of 18 inches along the channel bottom and sideslopes. Appropriate <br />bedding material was placed as a base for the riprap. <br />Design details for each channel section are summarized in Figure 5, Refuse <br />Collection Ditches - Design Detail. Refer to Table 11, Refuse Collection <br />Ditches, 100-Year, 24-Hour Hydrograph Analysis, at the end of this <br />section, for computer printouts. <br /> South Refuse Collection Ditch. The south refuse collection ditch extends <br /> around the southwest corner of the refuse storage pile and along its <br />• southern toe. This ditch collects surface drainage flowing off the <br />southern slope of the pile and runoff from a small undisturbed area <br />southwest of the pile, and routes it to the east to Sedimentation Pond 4. <br />ll7 <br />