My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25160
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:58 PM
Creation date
11/20/2007 5:20:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Hydrology
Doc Date
2/8/2000
Doc Name
PUBLIC NOTICE OF COMPLETED APPLICATIONS AND TENTATIVE DETERMINATION TO ISSUE WASTE DISCHARGE PERMITS
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Purpose of Public Notice: This notice states the intent of the WQCD to petition for the <br />imposition of a negotiated civil penalty against the University of Colorado at Boulder ("CU"). <br />The penalty consists of an $8,500 amount to be offset up to $2,500 of the penalty at a rate of <br />$2.00 of Supplemental Environmental Project ("SEP") cost per $1.00 of the penalty. The <br />remaining cash amount will be paid to the State General Fund. This penalty is sought pursuant to <br />the Water Quality Control Act, § 25-8-608, C.R.S. as alleged in the Compliance Order on <br />Consent to be issued by the WQCD and the DOW. <br />CU owns and operates Williams Village Power Plant which is located in Boulder County, <br />Colorado and is unauthorized to discharge wastewater into Bear Canyon Creek. <br />Tentative Determination: State tentative determinations have been made in conjunction with the U.S. EPA <br />that limitations and conditions imposed in these permits implemen[ all applicable statutes and regulations <br />and water quality standards. <br />Public Meetines: Permit Action: Pursuan[ to 25-8-502(3)(b), by Marcb 6. 2000, interested persons may <br />submit a written request for a public meeting on the tentative determination. The Division, after <br />considering all requests, may grant a public meeting for good cause shown. It will be held within sixty <br />(60) days of the date of public notice. <br />Public Comments: Permit Actiops: Pursuant to 25-8-502(3)(c) interested persons may submit written <br />comments on the tentative determination provided they are received by the Division by March 6. 2000. <br />All commenu received prior to said date will be considered in the formulation of final conditions and <br />limitations. If a public meeting is held, the public commem period shall close sixty (60) days following the <br />public notice. <br />Following the public comment period and the public meeting, if one is held, the Department will issue or <br />deny the final permit. Interested parties then have thirty (30) days to request an adjudicatory hearing on the <br />permit. <br />Mailin¢ Address: Public comments should be directed to the CDPHE. WQCD-P-B2, 4300 Cherry <br />Creek Drive South, Denver, Colorado 80246. <br />Further Informatiop: Permit Actiops: The draft permit is available for inspection at your County <br />Commissioner's Office and County Health Deparunent, or can be obtained by writing to the Division a[ <br />the above address and paying a small charge per page for copying fees. <br />Material Iniurv to Water Riehts: In accordance with C.R.S. 25-8-I04 (2) (d) (1989), any person who <br />believes that any actions proposed in this notice have the potential to cause material injury to a water right <br />is advised to contact the Division, in writing by March 6. 2000. The written notification should explain <br />how the material injury will be incurred. <br />PUBLIC NOTICE NUMBER: CO.00-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.