My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25128
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:57 PM
Creation date
11/20/2007 5:18:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Hydrology
Doc Date
3/12/1991
Doc Name
PN C-84-065 COAL RIDGE 1 MINE REVISED PERMIT APPLICATION COAL LOADING FACILITY NPDES DISCHARGE
From
NEW CASTLE ENERGY CORP
To
MLRD
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ~ COLORADO DEPARTMENT OF HEALTH, Water Quality Control Division <br />Rationale - Page 3. Permit No. COG-850025 <br />V. TERMS AND CONDITIONS OF THE PERMIT: <br />Active mining limitations and monitoring requirements in the permit <br />apply to outfall 001. In the permit, active mining effluent limitations <br />are specified in Part I.B.1.(a); burden of proof requirements are <br />indicated is Part I.B.2.(d); monitoring requirements are specified in <br />Part I.B.2; and special notification requirements for effluent <br />violations are addressed in Part II.A.3. <br />The facility is a new source facility under federal definition, <br />therefore the new source limitations on pages 4 and 5 of the permit <br />shall apply to this facility. The Total Iron limitations for the New <br />Source Performance Standards (3.0/ 6.0 mg/1) applies to this facility, <br />since this permit discharge is for a new facility (after May 4, 1984). <br />Salinity (TDS) monitoring of the discharge is required. Total <br />Phosphorus monitoring is not required. <br />The permittee is encouraged to read the general rationale for an <br />understanding of how this permit was developed and read the permit to <br />see what requirements exist. <br />Since there is no fuel storage structures or other materials on site, a <br />Materials Containment Plan is not required for this permit. However, <br />diking should be performed as discussed on page 9 of the general <br />rationale and in Part I.B.1.(c)4 of the permit. In addition, as <br />required in Part II.A.8, 9, and 12, the permittee is to utilize proper <br />operation and maintenance to ensure that there is a minimization of <br />adverse impact from the facility. <br />Based on the above information, Newcastle Energy Corporation is <br />certified to discharge under the general permit for coal mining <br />facilities for the Lacy Loadout facility. The general coal mine permit <br />is identified as permit number COG-850000. All correspondence relative <br />to the Newcastle Energy Corporation Lacy Loadout facility should <br />reference the specific facility number, COG-850025. <br />Don Holmer <br />March 4, 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.