Laserfiche WebLink
• <br />EXCAVATING INC. <br />P.O. Box 790 195 W. Jefferson <br />Hayden, Colorado 81639 <br />(970) 276-3359 <br />(970) 276-3084 Fax <br />August 6, 2001 <br />Division of Minerals & Geology <br />Attn: Thomas A. Schreiner <br />1313 Sherman S[. Room 215 <br />Denver, CO 80203 <br />Re: File No. M-2001-023, Camilletti Pit f{2 <br />Dear Sir: <br />• iii iiiiiiiiiiiu iii <br />RECCIVEa <br />AUG 1 0 2G~1 <br />Division of Minerals and Geology <br />At this time Precision Excavating, Inc. is requesting a technical revision to our permit to allow for an <br />incremental bond and phased mining plan. The total acreage of pit disturbance expected throughout the life <br />of the operation is 36 acres. Under the terms of this revision request, the mine plan will consist of 2 <br />phases, which are not concurrent. Please see attached map showing the 2 phases. Each phase will have no <br />more that 18 acres of active pie dismrbance, plus 5 acres of moderate dismrbance at any one time. Prior to <br />disturbance in the Phase 2 portion of the operation, the operator will either supply an additional $100,000 <br />financial warranty or will request a reevaluation of the reclamation cost by the Division. <br />Thank you, for your time and attention to [his matter. <br />Sincerely, <br />~W uv~' <br />David S. Zehner <br />Vice-President <br />DSZ/ses <br />