My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE57055
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE57055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:59:28 PM
Creation date
11/20/2007 5:17:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
COLO DEPT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIV
Section_Exhibit Name
Exhibit 2.03-E4 Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />MITIGATION PROCEDURES <br />Those portions of the haul roads within Somerset which are not paved <br />will be chemically stabilized and watered to control dust. A truck <br />"bump' will be built just before (i.e., north and east of) the rail road <br />crossing on the truck haul road. This truck bump will be designed to <br />shake the residual dirt/coal from the tires of the truck prior to exiting <br />onto the main highway. <br />Through proper loading of the coal into the truck (i.e., not over- <br />loading) coal falling from the bed of the truck can be controlled. A <br />truck ramp that places the trucks closer to the loading chute has already <br />been installed; this prevents the overloading of the trucks. In <br />addition, an operator training program will be established to insure the <br />truck loading operator is properly instructed in the correct loading <br />procedures. <br />TRAIN LOAD-OUT FACILITY <br />The train load-out facility consists of an 8,500 ton silo. The silo <br />is loaded from a conveyor belt connected to the crusher and surge pile. <br />The belt unloads the coal into the top of the silo which then free falls <br />to the current coal level. The train pulls through the silo, which is <br />walled on two sides, where the coal is dropped by chute into the open <br />cars. <br />Two sources of fugitive dust emissions from the silo were identified. <br />The conveyor belt feeding the silo is located at the top of the structure <br />inside a closed cupola. Tlie source of dust from this operation comes <br />from the open gap between the top of the silo and the cupola. During the <br />silo filling process, the dust can escape to the atmosphere through this <br />opening. <br />The second source of dust would be from the train loading process. <br />As the coal is gravity fed into the train cars, dust is generated. Even <br />though the train loading is inside the silo, the two ends of the silo are <br />open for train passage. <br />MITIGATION PROCEDURES <br />This open area between the top of the silo and the cupola has already <br />been covered to prevent the release of dust from this potential source. <br /> The train loading chute is a telescoping chute which lowers into the <br /> train car prior to loading. The chute is gradually lifted as the car <br /> fills. It is felt that this device is sufficient to control dust <br /> emissions from this source. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.