Laserfiche WebLink
OXBOW MINING, INC. <br />Permit No. 98GU0812 <br />Initial Approval <br />Page 8 <br />PARTICULATE EM1SSlONS CONTROL PLAN FOR MINING ACTIVITIES <br />THE FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL BE USED FOR COMPLIANCE <br />PURPOSES ON THE ACTIVITIES COVERED BY THIS PERMIT, AS REQUIRED BY THE AIR QUALITY <br />CONTROL COMMISSION REGULATION N0.1, Section III.D.1.b. THIS SOURCE IS SUBJECT TO THE <br />FOLLOWING EMISSION GUIDELINES: <br />a. Mining Activities -Visible emissions not to exceed 20%, no off-property transport of visible <br />emissions. <br />b. Haul Roads - No off-property transport of visible emissions shall apply to on-site haul roads, the <br />nuisance guidelines shall apply to off-site haul roads. <br />c. Haul Trucks - No off-property transport of visible emissions except that when operating oft the <br />property of the owner or operator, the applicable guidelines shall be no off-vehicle transport of <br />visible emissions. <br />Control Measures <br />• 1. Adequate soil moisture must be maintained in topsoil to control emissions during removal. <br />Watering shall be implemented if necessary. <br />2. All stockpiles shall be compacted and watered as needed to control emissions. <br />3. Topsoil stockpile shall be revegetated within one year. <br />4. Emissions from material handling (i.e. removal, loading, and hauling) shall be controlled by watering <br />at all times unless natural moisture is sufficient to control emissions. <br />5. Vehicle speed on unpaved roads and disturbed areas shall not exceed a maximum of 15 m.p.h. <br />Speed limit signs shall be posted. <br />6. Unpaved haul roads shall be treated with chemical stabilizers per manufacturer's specifications. <br />7. Unpaved haul roads shall be watered frequently to control fugitive particulate emissions. <br />8. All disturbed areas shall be watered as needed to control emissions. All inactive areas shall be <br />revegetated as soon as operationally feasible. <br />9. Reclamation works and sequential extraction of material shall be initiated to keep the total <br />disturbed areas at any one time to a minimum. <br />• 051/7/7-29 <br />