Laserfiche WebLink
~• <br />~~ <br />EXHIBIT S -Permanent Man Made Structures <br />Permanent man-made structures within 200 feet of affected land include the <br />following: <br />r c r <br />On-Site Oil/Gas Pipeline <br />Oil/Gas Well <br />caner <br />Sinclair Pipeline Co. <br />Vessels Oil & Gas Co. <br />Last Chance Ditch <br />Off-Site Weld County roads 26 '/. <br />15 and 26 <br />Last Chance Ditch Company <br />Weld County Government <br />It is not anticipated that mining operations will adversely affect the stability of any <br />of these structures. The applicant is in the process of obtaining the notarized <br />agreements required by 115(4)(e1 (Exhibit S). A copy of the agreement is included <br />in this section. <br />