Laserfiche WebLink
I hereby certify that I have reviewed the foregoing Best <br />Management Practices Plan ("BMP"), Spill Prevention Control and <br />Countermeasure Plan ("SPCC"), and Materials Containment Plan <br />("MCP"), that I have examined the Southfield facility and, being <br />familiar with the provisions of 40 CFR, Part 112, attest that this <br />BMP and SPCC have been prepared in accordance with good <br />engineering practices. <br />eg stered P e al Engineer <br />Sta a of C orado <br />No. 137 <br />F <br />;p <br />NUMBER <br />13746 <br />~'r <br />....~ <br /> <br />