LAFARGE <br />NORTH AMERICA <br />Construction Materials <br />The concrete-lined ditch will eliminate water loss concerns, however, <br />replacements will be made according to the Ageement. <br />16. Lafarge will utilize the existing farm access points during mining operations, these gavel <br />roads have been identified in Exhibit C. The access roads are approximately I S feet <br />wide, no improvements to the roads are necessary. When mining operations are <br />complete, the roads will be restored to their original condition. <br />17. Topsoil and overburden will be stripped with scrapers or dozers and placed separately in <br />temporary stockpiles within the mining area limits. The topsoil will be segegated and <br />stored separately from the overburden material as required by Rule 3.1.9(1). The depth of <br />topsoil to be stripped is 4" to 6"; the depth of overburden varies from 1.5' to 4.5'. The <br />mine plan map depicts the location and configuration of the topsoil piles. The stockpiles <br />will be protected from wind and water erosion by vegetative cover if in place more than 1 <br />year, please see the Proposed Seed Mix on page 13 of the Revised Duckworth 112 <br />Reclamation Permit Application. The stockpiles will be broadcast seeded and <br />incorporated into the weed control progam. Weed control consists of monthly <br />inspections during weed season and, if necessary, chemical treatments in the applicable <br />fall and spring seasons. Topsoil stockpiles in place for less than one yeaz will not be <br />vegetated. <br />18. The proposed conveyor crossing of WCR 20'/z will be an enclosed 100 foot span, 17 <br />foot in height. The conveyor is composed of steel; the footings are anchored in concrete. <br />See enclosed Proposed Overhead Conveyor drawing for specifics. The bridge Lafazge <br />anticipates using at the Duckworth property is currently in use at our Tanabe property. <br />The enclosed engineering drawings provide specific information regazding the <br />foundations. When mining operations aze complete, the conveyor will be removed and <br />all areas affected by the conveyor will be returned to their original condition <br />19. Scrapers will be used to place the backfilled overburden and topsoil, Using scrapers to <br />layer the lifts at a 3:1 slope ensures a stable configuration. <br />20. All slopes, both above and below the water line, will be reclaimed no steeper than 3:1. <br />21. All Bankazd Sandy Loam located east of Idaho Creek will be salvaged in stockpiles for <br />use in reclamation. All topsoil will be replaced in disturbed azeas at a depth of6-IZ". <br />22. The following seed mix and rate was recommended by the Soil Conservation Service: <br />LAFARGE NORTH AMERICA INC. -Lafarge Construction Materials <br />1400 West 64~ Avenue, Denver, Colorado 80221 <br />Telephone: (303) 657-4000 Facsimile: (303) 657-4037 <br />