Laserfiche WebLink
BJ-SIN RESOURCES. INC. <br />//~,/ SEDIMENTAT1I~~O,AN,POND INSPECTION FORM <br />Pond ~~"C~ ~!A-ei,~- r~~ NPDES No. d~ <br />. - <br />~. <br />~ Date of Inspection ~ L ~/ RECF'lli~~ ; <br />EMBANKMENT ~~ ` ~(~- Q~~ ~> 1993 <br />1. Adequacy of the vegetative cover: Exce]~r~t, Moderate, Few, Poor <br />J i ~i imuiv ~~S 7, UGJ:GUY <br />2. Erosion forming gullies: Extensive, Some, Very law, None <br />• 3. Is wove action ceasing erosion: <br />On the upstream embankment? Yea No <br />At the principal spillway inlet? Yes, No <br />4. Erosion of the downstream toe of the embankment? 'Yea No <br />The cause of the erosion is attributed to: <br />..-- <br />5. Is seepage occurring through the dam? Yea No If yes <br />could this seepage cause potential instability? lies No <br />Exoplain: ~• (/ (//~~~ X/} /~/~~-(/~~"(~~(D <br />PRINCIPAL SPILLNAY ~ °y~ <br />1. Is the prineip•sl spillway system in working order? Yea No <br />2. Is the inlet free of debris end restrictive materiel.?Yes No <br />( ~: <br />3. Is the discharge outlet free of restrictive material.? Yes No^ <br />4. Is erosion occurring nt the discharge outlet? Yes No If <br />yes, <br />evaluate the severity: Extensive Moderate Juat starting None <br />EMERGENCY SPILLNAY <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yes No <br />2. Does it appear nn if the emergency spillway has discharged water <br />since the last inspection? Yes No <br />3. Ia erosion occurring nt any section of the emergency spillway? <br />Yes No Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Bas the design storage capacity. of the reservoir been surpassed? <br />Yea No If yee~ <br />exp],nin: <br />~~~-!` Please ad~i any apecinl comments concerning potentially d~nngerous <br />problems on the beck of this sheet. <br />Inspector <br />