My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO25094
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO25094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:56 PM
Creation date
11/20/2007 5:16:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
8/5/1993
Doc Name
2ND QTR 1993 IMPOUNDMENT INSPECTIONS
From
BASIN RESOURCES INC
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />~~ <br />_.. <br />2. Erosion forming gullies: Extens ve~me, Very Few, None <br />3. Is wove action causing erosion: <br /> On the upstream embankment? Yes No / <br /> At the principal spillway inlet? Yea , No~L <br />4. Erosion of the downstream toe of the embankment? Yes No ~/ <br /> The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes No ~ - If yes <br /> could this seepage cause potential in~.tsibility? Yes No <br /> Explain: Na cl,~,~1-(~.~ "'~,.,,Jr nXX.u~.,,~~ <br />~i- r; <br />Pond a~U~nl ~i-a-5~2. // NPDES No._ (3a Z <br />Date of Inspection 6~/Z /93 AUK 51993 <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: x ellent, Moderate, Few, Poor <br />PRINCIPAL SPILLWAY <br />1. Is the principal spillway system in working order? Yes ~No <br />2. Is the inlet free of debris and restrictive material?Yes~No <br />3. Is the discharge outlet free of restrictive material? Yes ~/NO_ <br />4. Is erosion occurring at the discharge outlet? Yes__No !/If <br />yes, <br />evaluate the severity: Extensive Moderate Just starting None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yes ~ No <br />2. Does it appear as if the emergency spillway has discharged water <br />since the last inspection? Yes No_d~ <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yes No c/ Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Hae the design storage capacity of the reservoir been surpassed2 <br />Please ads any special comments concerning potentially dangerous <br />problems on the back of this sheet. <br />Inspector' a~+~^- <br />
The URL can be used to link to this page
Your browser does not support the video tag.