Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />February 2005 Monthly Report <br />Page 3 <br />Table 2 -February 2005 Tailing Disposal Area Piezometer Depth to Water <br />Measurements <br />Piezometer Date Depth to Water <br />feet Total Depth (k) Volume of <br />Water k <br />P6 2/28/05 D 72.46 0.00 <br />P7 2!28/05 92.33 92.50 0.17 <br />P8 2/28/05 96.87 97.51 0.64 <br />P9 2/28/05 71.78 72.30 0.52 <br />P10 2/28(05 57.39 58.30 0.91 <br />PI1 2/28/05 41.28 41.80 0.52 <br />P12 2/28/05 41.65 41.71 0.06 <br />P13 2/28/05 40.94 41.34 0.40 <br />P14 2/28/05 D 41.24 0.00 <br />P 15 2/28/05 D 41.10 0.00 <br />No Water Treatment Plant sludge was managed for the month of February. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />379-0799 or Mr. Bill Lyle (303) 324-2630 or (970) 325-4482. <br />cerely ~~~~ <br />t <br />lio F. Madrid <br />nvironmental Coordinator Ill <br />Cc: Bill Lyle <br />file <br />