Laserfiche WebLink
Zf ~ • <br />-3- <br />determined: <br />b) The Board will arter the lands to perform reclamatiom only if the Board has <br />not beery performed., and <br />i. that reclamation required by law to have bear performed upon such lands has <br />ii. that financial warranty forfeiture proceedings described in the Act or similar <br />provisions of subsequart laws, ifany, have bear initiated. <br />c) The Division, aging for the Board, will arter lands to respond to an emergarcy only <br />where the Division detemtines that any ofthe conditions of Construction Material Rule 8.4.2. exist. <br />'n The additional conditions set forth in the attadred rider, if any, are incorporated herein by <br />reference. <br />/~/ a) Rider is attadred. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. L NG <br />Division Director <br />M105Sbdc11~IM.pp-3Z M19990a2 CHM 1(gW109 IOa908 AM.dw <br />